Poineer Food Cannery

A successful IT infrastructure project on the implementation of Microsoft Hyper-V installation has been Completed for the Pioneer Food Cannery this year in February.

The Microsoft Hyper-V was installed on two Dell PowerEdge R410 Servers with the cluster failover integration.

The testing of this project was done by PCF confirming the following:

  • Redundancy of the servers
  • Redundancy of the Switches
  • Redundancy of the SAN Controller
  • Redundancy of the virtual Machines

The Memory and the disk space to the virtual machines was assigned according to the need of the customer.

IPMC will provide systems and maintenance support for the equipment and software supplied.

 

Featured Products